Typhonix News

PWW 2016 - Coalescing Pump Paper

The paper called Performance of a Coalescing Multistage Centrifugal Produced Water Pump with Respect to Water Characteristics and Point of Operation is now available at lowshearschool.com
nel%e2%80%99s produced water workshop 2016
11.05.2018
The paper was presented at the 2016 Produced Water Workshop and investigates the coalescing effect of Typhonix coalescing pump with respect to the point of operation and water characteristics.

Link to paper


 

Visiting address offices:

Robotvegen 8
4341 Bryne

Postal address:

P.O.Box 6
N-4349 Bryne

Visiting address test center:

Robotvegen 8
4341 Bryne

Email:

Typhonix
“Theory is invaluable but nothing beats empirical knowledge”
Typhonix

Contact Typhonix:

Ole Jørgen Engelsvoll
General Manager: 
+47 934 01 294
ole.engelsvoll@typhonix.com